Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Pradhan Mantri Gram Sadak Yojana
Tender ID5141877
Organisation NamePradhan Mantri Gram Sadak Yojana
Tender BriefCorrigendum : Renewal Coat Under Cities And Towns On Road Tehr To Ghat Under Pkg No. Jk07-wb02, Block Billawar, District Kathua, Length 10 Kms, Including Initial Rehabilitation, Periodic Renewal, Emergency Works And 5 Year Routine Maintenance After Completion
Last Date For Submission11th Sep, 2026
Opening Date12 Sep, 2026
Cost
Document Cost10000.00
EMD754760.00
Estimated Cost37738000.00
Location
CityBillawar
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1INITIAL REHABILITATION Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres, as directed by Engineer-in-Charge. All kind of Soil 90% Ordinary Rock 10%37.02Cum
2Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)6.54Cum
3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)19.18Cum
4Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete(Coping)32.40Sqm
5Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete.65.03Sqm
11th Sep, 2026

5 Days Left

WhatsApp