Tendering Authority: Irrigation And Waterways Department
Tender ID2785534
Organisation NameIrrigation And Waterways Department
Tender BriefCorrigendum : Rehabilitation Work Of Downstream Of Tilpara Mihirlal Barrage Within Block-suri-i, P.s.- Suri, Dist. Birbhum
Last Date For Submission16th Mar, 2026
Opening Date16 Mar, 2026
Cost
Document Cost0.00
EMD5000000.00
Estimated Cost898271076.00
Location
CityBIRBHUM
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. (b) above 150 mm. thick.995.420Cum
2Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth (iii) Without pumping out water but including shoring as required78474.740Cum
3Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. b) 3 m to 6 m depth (iii) Without pumping out water but including shoring as required75592.810Cum
4Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. c) Above 6 m depth (iii) Without pumping out water but including shoring as required35505.380Cum
5Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge. 1. Labour rate per m is provided; Cost of sand is to be added to arrive at the complete item rate. 2. Compaction factor of dry clean sand is 0.8359324.110Cum