Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4823226 |
|---|---|
| Organisation Name | Irrigation And Waterways Department |
| Tender Brief | Corrigendum : Repair And Maintenance Work To The Aquiduct At Ch.18.00 Of Ksmc Under Kultore (i) Section Of Bolpur Irrigation Sub Division Within Mayurakshi South Canals Division. |
| Last Date For Submission | 24th Jul, 2026 |
| Opening Date | 24 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 42031.00 |
| Estimated Cost | 2101513.00 |
| City | BIRBHUM |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cutting uprooting and clearing jungles including shrubs,waterweeds,bushes,trees,plants,upto30cm.girth including removing as directed by Engineer-in-charge. | 468.00 | sqm |
| 2 | Dismantling of Structures Dismantling of existing structures like culverts, bridges,retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD.(I) By Manual Means b) Cement Concrete | 89.98 | Cum |
| 3 | Earth work in excavation of foundation trenches ordrains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.` | 23.87 | %Cum |
| 4 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of B) Beyond 1.00 km and upto 2.00 km NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. | 1318.59 | Cum |
| 5 | A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to to be made on measurement of finished quantity) | 5.48 | Cum |
8 Days Left