| Tender ID | 4823227 |
|---|---|
| Organisation Name | Irrigation And Waterways Department |
| Tender Brief | Corrigendum : Repairing Of Damaged Pipe Culvert At Ch.0.00 Of Minor -2, 3 And 4 Of Dy. 21 Of Ksmc Near Ch. 77.50, Ch. 140.00 And Ch. 156.00 Respectively Under Salar Irrigation Sub-division Within Mayurakshi South Canals Division. |
| Last Date For Submission | 24th Jul, 2026 |
| Opening Date | 24 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 6107.00 |
| Estimated Cost | 305344.00 |
| City | BIRBHUM |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3 m depth (iv) Without pumping out water and shoring | 119.55 | Cum |
| 2 | Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge. | 9.86 | Cum |
| 3 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. | 8.01 | Cum |
| 4 | Providing and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in single row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD. (F) 600 mm dia | 30.00 | Metre |
| 5 | Earthwork in filling in foundation trenches with good earth in layers not exceeding 15cm. including watering and ramming layer by layer complete with earth obtained from excavation of foundation or from fresh excavation of land arranged by Department within a lead of 150 m. | 26.28 | Cum |