Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5025908 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction Of Road From Main Road Kanjak Devi Sathan To Onwards Shamshan Ghat Roads (under District Capex Budget 2026-27) |
| Last Date For Submission | 29th Jul, 2026 |
| Opening Date | 30 Jul, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 10000.00 |
| Estimated Cost | 500000.00 |
| City | Bishnah |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | JCB Engaged for site clearance and berm dressings | 10.00 | Hrs. |
| 2 | Providing and laying RBM in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., (incl. all leads, lifts and carriage complete) | 425.00 | CUM |
| 3 | Providing & Laying WBM Grade - II with specified stone agg. & binding material including Screaning, sorting. spreading to template & consolidation with power road roller of minimum 8-10 ton capacity. Base course with 63mm to 45mm size including stone screaning 13.20mm size with complete job | 72.75 | CUM |
| 4 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge | 72.75 | CUM |
| 5 | Carriage of material by mechanical transport including loading/unloading and stacking at site for an avg. lead 10 KM |
8 Days Left