Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4613770 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Stage Work For General Up-keeping Of Road From Bishnah To Bari Brahmana And Their Allied Links, Palli Ratnal Raod, Bishnah Deoli Road, Kanhal Sehora Road, Kothi Morh Jarallan Chak Road, Bishnah Palli Tanda Road, Palli Chak Murar Road Etc. By Way Of |
| Last Date For Submission | 24th Jun, 2026 |
| Opening Date | 25 Jun, 2026 |
| Document Cost | 600.00 |
|---|---|
| EMD | 8880.00 |
| Estimated Cost | 444000.00 |
| City | Bishnah |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed,All kinds of soil . | 4.24 | cum |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 7500.00 | sqm |
| 3 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in - all kinds of soil. | 900.00 | sqm |
| 4 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 152.25 | cum |
| 5 | Providing and Laying River Bed Material by way of Spreading in uniform layer, watering, and compacting with power road roller 8-10 capacity including carriage of material with average lead of 15km. The measurement to be taken of compacted/ finished work. | 133.00 | cum |
1 Days Left