Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: South Eastern Coalfields Limited
Tender ID4072082
Organisation NameSouth Eastern Coalfields Limited
Tender BriefTreatment Of Roof By App Atactic Polypropolene Polymer For Non Residential Building Of Bishrampur Amgaon Sub Area Of Bishrampur Area.
Last Date For Submission4th May, 2026
Opening Date05 May, 2026
Cost
Document Cost0.00
EMD16500.00
Estimated Cost1315914.00
Location
CityBishrampur
StateChhattisgarh

Register to see full details

BOQ Items
#ItemQtyUnits
1Removal and cleaning of roof surface by uprooting of vegetation etc as per instruction of Engineer in charge.220sqm
2Grading roof for water proofing treatment with Cement concrete 1:2:4 (1 cement: 2coarse sand : 4 graded stone aggregate 20mm nominal size)55.63cum
3Providing and Mixing water proofing solution such Dr. fixit or equivalent at the rate of 200 ml per bag of cement or as approved by the Engineer In Charge71.21Lit
4Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer 3 mm thick water proofing membrane, black finished reinforced with non-woven polyester matt consisting of a coat of bitumen primer for bitumen membrane @ 0.40 litre/sqm by the same membrane manufacture of density at 25 C, 0.87-0.89 kg/ litre and viscocity 70-160 cps. Over the primer coat the layer of membrane shall be laid using Butane Torch and sealing all joints etc, and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under : Joint strength in longitudinal and transverse direction at 23 C as 650/ 450N/5cm. Tear strength in longitudinal and transverse direction as 300/250N. Softening point of membrane not less than 150 C. Cold flexibility shall be upto -2 C when tested in accordance with ASTM,D - 5147. The laying of membrane shall be got done through the authorised applicator of the manufacturer of membrane : 3 mm thick1591.59sqm
5Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.39.78cum