Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3931344 |
|---|---|
| Organisation Name | Water Resources Department |
| Tender Brief | Construction Of Open Iron Kitchen Set In Kasturba Gandhi Vidyalaya In Chandankiyari, Under Block- Chandankiyari, Bokaro. |
| Last Date For Submission | 13th Apr, 2026 |
| Opening Date | 15 Apr, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 39500.00 |
| Estimated Cost | 1971230.00 |
| City | Bokaro |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in hard soil (vide classification of soil item - A+B) and disposal of excavated earth as obtained to a distance up to 50M including all lifts with leveling, ramming the foundation trenches, removing roots of trees, shrubs all complete as perbuilding specification and direction of E/I. B.C.D. S.O.R. Item No. 5.1.1 + 5.1.2 | 21.16 | M3 |
| 2 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labours, royaly and taxes all complete as per building specification and direction of E/l. B.C.D. S.O.R. Item No. 5.1.10 | 23.63 | M3 |
| 3 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes, royalty all complete as per building specification and direction of E/I. B.C.D. S.O.R. Item No. 5.6.3 | 163.77 | M2 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) B.C.D. S.O.R. Item No. 5.3.1.2 | 21.24 | M3 |
| 5 | Providing 50mm thick cement concrete flooring (1:2:4) with 20mm to 6mm size graded stone chips finished with floating coat of neat cement panels, including cost of curing, finishing the surface smooth by rubbing with carborundum stone taxes royalty all complete as per building specification and direction of E/I. B.C.D. S.O.R. Item No. 5.6.9 | 139.41 | M2 |
6 Days Left