| Tender ID | 3890838 |
|---|---|
| Organisation Name | Central Coalfields Limited |
| Tender Brief | Pre Monsoon Repair And Maintenance, Re-organisation Of Dedicated 3.3kv Pump Feeder From Coal Face To The Pumping Station And Extension Of The Lines As Per Requirement During The Monsoon In Respect Of Bokaro Colliery, Bnk Area |
| Last Date For Submission | 11th Apr, 2026 |
| Opening Date | 13 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 10000.00 |
| Estimated Cost | 797551.00 |
| City | Bokaro |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required. Above 8.0 metre and upto 10.0 metre | 17 | Each |
| 2 | Dismantling of over head lines comprising of copper/ aluminium over head conductor, G.I. wire, cross arms, insulators etc. as required. | 675 | kg |
| 3 | Supplying and erection of galvanised stay set for 11 KV over head lines complete with 19/ 20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm thick, thimble, stay clamps, turn buckle ( 20 mm X 600 mm ), 7/ 4.00 mm dia G.I. stay wire and 11 KV strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required. | 8 | Set |
| 4 | Supplying of two lengths of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) double pole cross arm for three wire 11KV over head line conductors complete with through bolts and nuts for clamping to the poles, 50 mm X 6 mm M.S. flats welded on one side to the channel iron and with bolts and nuts on the other side for tying the cross arms together, including drilling holes for insulator pins/ fittings, bolts, nuts and washers etc (as per drawing) and painting with primer and finish paint as required . | 15 | Set |
| 5 | Erection of double pole 3 wire cross arm for 11KV/ 22KV/ 33 KV over head lines as required. | 15 | Each |