Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Central Coalfields Limited
Tender ID3890838
Organisation NameCentral Coalfields Limited
Tender BriefPre Monsoon Repair And Maintenance, Re-organisation Of Dedicated 3.3kv Pump Feeder From Coal Face To The Pumping Station And Extension Of The Lines As Per Requirement During The Monsoon In Respect Of Bokaro Colliery, Bnk Area
Last Date For Submission11th Apr, 2026
Opening Date13 Apr, 2026
Cost
Document Cost0.00
EMD10000.00
Estimated Cost797551.00
Location
CityBokaro
StateJharkhand

Register to see full details

BOQ Items
#ItemQtyUnits
1Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required. Above 8.0 metre and upto 10.0 metre17Each
2Dismantling of over head lines comprising of copper/ aluminium over head conductor, G.I. wire, cross arms, insulators etc. as required.675kg
3Supplying and erection of galvanised stay set for 11 KV over head lines complete with 19/ 20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm thick, thimble, stay clamps, turn buckle ( 20 mm X 600 mm ), 7/ 4.00 mm dia G.I. stay wire and 11 KV strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required.8Set
4Supplying of two lengths of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) double pole cross arm for three wire 11KV over head line conductors complete with through bolts and nuts for clamping to the poles, 50 mm X 6 mm M.S. flats welded on one side to the channel iron and with bolts and nuts on the other side for tying the cross arms together, including drilling holes for insulator pins/ fittings, bolts, nuts and washers etc (as per drawing) and painting with primer and finish paint as required .15Set
5Erection of double pole 3 wire cross arm for 11KV/ 22KV/ 33 KV over head lines as required.15Each
11th Apr, 2026

10 Days Left

WhatsApp