| Tender ID | 4815536 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Improvement/ Upgradation Of Zinpanchal Futlipora Road (machine Mix To Be Laid With Paver). |
| Last Date For Submission | 13th Jul, 2026 |
| Opening Date | 14 Jul, 2026 |
| Document Cost | 800.00 |
|---|---|
| EMD | 39280.00 |
| Estimated Cost | 1964000.00 |
| City | Budgam |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Engagement of JCB for removal of slips,widening of road, cutting/removal of trees, easing of steep grade including disposal of the same as directed, complete Job. | 18.00 | Hr |
| 2 | Supplying, stacking, spreading, laying and compacting of graded stone aggregate (Quarry) of size range 63-45mm with stone screening/chippings 13.2mm size nominal size type A, stone dust moorum (Khakh Bajri) as per standard specifications to WBM specifications in uniform thickness incl. rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. incl. all carriages involved, etc. as per directions of EIC. Complete job | 60.48 | cum |
| 3 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge | 27.38 | cum |
| 4 | Providing and applying tack coat using hot straight run bitumen of grade VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning andpreparing the existing road surface as per specifications. | ||
| 5 | On W.B.M. @ 0.75 Kg/sqm | 365.00 | Sqm |