Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4113533 |
|---|---|
| Organisation Name | Directorate Of Urban Local Bodies |
| Tender Brief | Corrigendum : Nagar Panchayat Dankaur Me Ward No-09 Dhanauri Road Par Devendra Ke Makan Se Subhash Ke Makan Tak Cc Road And Nali Nirman Karya. |
| Last Date For Submission | 29th May, 2026 |
| Opening Date | 30 May, 2026 |
| Document Cost | 4602.00 |
|---|---|
| EMD | 389100.00 |
| Estimated Cost | 0.00 |
| City | Bulandshahr |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cartage of earth work in filling lead upto 08 km. distance from site complete work. (A.R.) | 186.37 | M3 |
| 2 | RCC Work with cement,approved coarse sand @2 cm gauge approved stone grit in proportions of 1:2:4 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and shuttering etc and supply of all materials,labour,tools & plants etc and supply of all materisals, labour,tools @plants etc required for proper completition of the work including cost of binding wire. The raet excludes making of drip course which shall be paid extra. S.I. No. 284 | 81.90 | M3 |
| 3 | M.S. (tor steel or plain) in plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend hooks and authorised overlapping shall be measured and including cost of binding wire. S.I. No. 504 | 51.76 | qtl |
| 4 | construction of granular sub-base by providing coars graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at desired density, including cost of all material, labour, T&P including all taxes, royalty, labour cess complete, as per mort clause (A.R.) | 97.50 | M3 |
| 5 | construction of WBM(G-3)by providing coars graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at desired density, including cost of all material, labour, T&P including all taxes, royalty, labour cess complete, as per mort clause (A.R.) | 73.13 | M3 |
2 Days Left