Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4610705 |
|---|---|
| Organisation Name | Uttar Pradesh Projects Corporation Limited |
| Tender Brief | Corrigendum : Providing And Fixing Of Iron/steel Grill And Other Miscellanous Work In The Girls And Boys Hostel, Residences Of Faculty/senior/junior Residents, Academic And Hospital Block Of Autonomous State Medical College Bulandshahr In District Bulandshahr. |
| Last Date For Submission | 27th Jun, 2026 |
| Opening Date | 27 Jun, 2026 |
| Document Cost | 11800.00 |
|---|---|
| EMD | 142000.00 |
| Estimated Cost | 7066000.00 |
| City | Bulandshahr |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete Fixed to steel windows by welding | 19691.580 | kg |
| 2 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work | 1367.490 | SQM |
| 3 | Providing and fixing double scaffolding system (cup lock type) onthe exterior side, up to seven story height made with 40 mm diaM.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for therequired duration asapproved and removing it there after .The scaffolding system shall be stiffened with bracings, runners,connection with the building etc wherever required for inspection ofwork at required locations with essential safety features for theworkmen etc. complete as per directions and approval of Engineerin-charge .The elevational area of the scaffolding shall be measuredfor payment purpose .The payment will be made once irrespective ofduration of scaffolding. | 10274.380 | SQM |
1 Days Left