| 1 | Providing, laying, spreading and compacting stone aggregates of specific sizes (22.4-53) to water bound macadam (WBM G-3) specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/vibratory, roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite typer of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density MoRT&H Specification 404 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. | 13.00 | cum |
| 2 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement (M-30 Grade) over a prepared sub base with approved grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. MoRT&H Specification 602 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. | 518.00 | cum |
| 3 | Excavation fork road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slops, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with in all lifts and lead upto 1000m. MoRT&H Specification 302(iii) Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. | 110.00 | cum |
| 4 | Plain Cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days MoRT&H Specification 2100 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. | 22.00 | cum |
| 5 | Plain cement concrete (1:2:4) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 for drain MoRT&H Specification 800 Including cost of, all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. | 48.00 | cum |