Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3992059 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Minor Bridge Construction Work At Makanpur Khadar To Anwargarh Takipur Bangar Bhaipur Road In District Gautambudhnagar |
| Last Date For Submission | 20th Apr, 2026 |
| Opening Date | 20 Apr, 2026 |
| Document Cost | 2714.00 |
|---|---|
| EMD | 1113000.00 |
| Estimated Cost | 18204030.00 |
| City | Bulandshahr |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. | 940.00 | cum |
| 2 | Providing concrete for plain/reinforced concrete PCC (1:1.5:3) Grade M10 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. | 170.00 | cum |
| 3 | Plain/reinforced cement concrete RCC grade M20 in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. | 124.00 | cum |
| 4 | Plain/reinforced cement concrete RCC M25 in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. | 262.00 | cum |
| 5 | Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. | 39.00 | MT |
6 Days Left