Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4462160 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Repair And Maintenance Of Residences In D.m. Colony Bulandshahr |
| Last Date For Submission | 8th Jun, 2026 |
| Opening Date | 08 Jun, 2026 |
| Document Cost | 767.00 |
|---|---|
| EMD | 45000.00 |
| Estimated Cost | 450000.00 |
| City | Bulandshahr |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. As Per DSR No.13.88. and including labour cess. But excluding GST. | 250.00 | Sqm |
| 2 | Dismantling tiled roofing with battens,boarding etc. complete including stacking of serviceable material & disposal of unserviceable material within 50 m lead.including all type of taxes,octroi,toll taxes,labour cess ,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.But Excluding GST. As per DSR 15.31 | 10.00 | Sqm |
| 3 | M-150 brick work in 1:4 one cement & four coarse sand in Super Structure including all type of taxes,octroi,toll taxes,labour cess ,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.But Excluding GST. As per DSR 6.4.2 | 5.00 | cum |
| 4 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under,including cutting the patch in proper shape, raking out joints & preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.With cement mortar 1:4 (1 cement : 4 Coarse sand)including supply of all materials, labour, T&P etc. required for proper completion of the work. Including Supply of all materials, Labour ,T&P etc & Also Including All taxes,labour cess, Royalty Etc But Excluding GST As per DSR 14.1.1 | 63.00 | Sqm |
| 5 | Steel work welded in built up sections/ framed work, including cutting, hoisting,fixing in position & applying a priming coat of approved steel primer using structural steel etc.as required.In stringers ,treads,landings etc.of stair cases,including use of chequered plate wherever required,all complete. including all type of taxes,octroi,toll taxes,labour cess ,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.But Excluding GST.As Per DSR 10.15.1 | 20.00 | Kg |
6 Days Left