Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4458365 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair/ Replacement Of Dosing Pumps, Filter Media, Pump Sets, Motor Starters And Miscellaneous Works At Afs Kumbhirgram |
| Last Date For Submission | 22nd Jun, 2026 |
| Opening Date | 24 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 42000.00 |
| Estimated Cost | 0.00 |
| City | Cachar |
|---|---|
| State | Assam |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling and taking down squirrel cage induction motor assembly (10 HP), 3Ph, 415V for heating, varnishing of motor winding, remetaling of shaft and replacement of bearing etc. including disconnection of cable, earthing strip etc carrying of pumping set to Silchar work shop from Kumba Pump house including loading/unloading and bringing back to same location after repair and testing at site with proper coupling and alignment, complete all as specified and directed. | 2.00 | Each Job |
| 2 | All as per item No. 1.00 here-in-before, but of capacity 40-50 HP, the motor to be taken to Silchar workshop from Kumbha Pump House, complete all as specified and as directed. | 2.00 | Each Job |
| 3 | All as per item No. 1.00 here-in-before, but of capacity 7.5 HP, the motor/submersible to be taken to Silchar workshop from Kumbha Pump House, complete all as specified and as directed. | 2.00 | Each Job |
| 4 | Dismantling and taking down squirrel cage induction motor assembly 10-15 HP, 3HP, 415V for heating, varnishing of motor winding, remetaling of shaft and replacement of bearing etc. including disconnection of cable, earthing strip etc carrying of pumping set to Silchar work shop from Sonatola Pump House including loading/unloading and bringing back to same location after repair and testing at site with proper coupling and alignment, complete all as specified and directed. | 3.00 | Each Job |
| 5 | All as per item No. 4.00 here-in-before, but of capacity 30 HP, the motor to be taken to Silchar workshop from Sonatola Pump House, complete all as specified and as directed. | 1.00 | Each Job |
6 Days Left