Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4605774 |
|---|---|
| Organisation Name | National Institute Of Technology |
| Tender Brief | Corrigendum : Architectural Engineering Services And Consultancy For Establishment Of Various Infrastructure Facilities At Nit Calicut |
| Last Date For Submission | 14th Jul, 2026 |
| Opening Date | 16 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 49000.00 |
| Estimated Cost | 2450176.00 |
| City | Calicut |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Consultancy charges for providing complete Architectural Engineering and Consultancy Services for establishment of various infrastructure facilities at NIT Calicut including preparation of detailed architectural designs and drawings, interior layouts, structural drawings/details wherever required, specifications, BOQ, detailed estimates, tender documents, assistance in tendering for the selection of the execution contractor, working drawings, shop drawings, utility drawings and all required engineering details for execution of civil, interior, electrical, networking, HVAC/air conditioning, acoustic, Audio Visual and PA system works, MEP coordination and allied services for 1. (a). Renovation of Ramanuja Hall, 1.(b). Renovation of MED Seminar Hall and 2. Renovation/interior development of TBI Office Space at Mega Hostel II, including periodical site visits, technical support, coordination with user departments and other execution stage technical consultancy services as per the scope, specifications and requirements of the EOI document. Rate should be quoted so as to fulfil all the activities mentioned as scope in this NIEOI document following the instructions of the Engineer-in-charge at NITC. Quoted rate should be inclusive of all the taxes & duties including GST. | 1.000 | Nos |
| 2 | Notes: 1. The quoted amount shall include all consultancy fees, travel expenses, site visits, coordination meetings, preparation of drawings, estimates, tender documents, revisions, execution support and PMC services required for completion of the consultancy assignment. 2. The quoted amount will be for all the 03 works (in two packages as noted in NIEOI). For the payment purposes, the proportionate amount for each works w.r.t their individual PAC as noted in the NIEOI will be considered and as per the approved yardsticks/payment milestones (formulated along with the agreement) will be followed. 3. No separate payment shall be made for preparation of revised drawings/details within the approved project scope. 4. GST is included in the quoted amount. 5. No escalation shall be payable during the contract period. 6. The quoted rates shall remain valid till completion of the consultancy services including execution support period. |
10 Days Left