Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4013515 |
|---|---|
| Organisation Name | Water Resources Department |
| Tender Brief | Corrigendum : Construction Of Open Type Bandhara At Atul Bhat House In V.p Loliem Polem In Canacona Taluka. (3rd Call) |
| Last Date For Submission | 4th May, 2026 |
| Opening Date | 06 May, 2026 |
| Document Cost | 3000.00 |
|---|---|
| EMD | 10001.00 |
| Estimated Cost | 500036.00 |
| City | Canacona |
|---|---|
| State | Goa |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means in all type of strata comprising any of materials such as soil, sand, clay, gravels, moorum of all varieties, shingles, pebbles, all types of conglomerate laterite rock, soft rock, disintegrated rock, fissured, shattered, decomposed rock or weathered rock and all such other materials in full or parts as the case may be adopting any approved method or methods as may be convenient or permitted inclusive of chiseling wedging etc. in all conditions such as dry, moist, saturated, submerged foul conditions, etc. including pumping or bailing out water including setting out construction of shoring and bracing, removal of stump and other deleterious matter, dressing of sides and bottom backfilling the excavated earth to the extent required and disposing of surplus excavated earth/river as directed by the engineer-in-charge with all leads and lift etc. as specified and directed etc. complete . | 60.87 | m3 |
| 2 | Providing & laying cement concrete 1: 1.5: 3 (1 cement: 1.5 coarse sand: 3 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a)All works upto plinth level. | 27.24 | m3 |
| 3 | b)In retaining walls, return walls (any thickness) including attached pilasters, columns, piers, abutments pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc. upto floor five level | 2.88 | m3 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of formwork for a)Foundations, footings, bases forcolumns and mass concrete. | 59.28 | m3 |
| 5 | b) Vertical surfaces such as retaining walls, return walls, walls (any thk) including attached pilasters buttresses, plinth and string course fillets, etc. | 13.36 | m3 |
6 Days Left