Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4771019 |
|---|---|
| Organisation Name | Andaman Lakshadweep Harbour Works |
| Tender Brief | Corrigendum : Repairing And Maintenance Of Crane Shed Of Alhw At Mus Car Nicobar. |
| Last Date For Submission | 11th Jul, 2026 |
| Opening Date | 13 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 21385.00 |
| Estimated Cost | 1069229.00 |
| City | CARNICOBAR |
|---|---|
| State | Andaman and Nicobar Islands |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolishing cement concrete manually by mechanical means including disposal of material within 50 meter lead as per direction of engineer in-charge and minor tools etc., cost of all labour charges minor tools, GST labour welfare cess etc.. | 4.00 | Cum |
| 2 | Providing form work including centering shuttering so as to give finish strutting and propping etc. height of propping and centering below supporting floors to ceilling not exceeding 4 m and removal of the same for in situ reinforced concrete and plain concrete work including cost of all labour charges, scaffolding charges, transportation charges of all materials to worksite and minor tools, GST, labour welfare cess etc., complete. | 52.00 | Sqm |
| 3 | Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq-meters and under, including cutting the patch in proper shape raking out joint and preparing and plastering the surface of the walls complete, including disposal of rubish to the dumping ground all complete as per direction of Engineer-in charges with cement morter 1:4(1 cement ,4 river sand and labour charges GST minor tools etc., complete | 110.00 | Sqm |
| 4 | Providing and laying of RCC 1:1.5:3 (one cement one & half mainland river sand, three stone chips 20mm (Port Blair Quarry product) including cost of cement, mainland river sand, 20mm size stone chips, cost of all labour charges for mixing of concrete, placing, consolidation, curing and transportation charges of mixer machine & vibrator, minor tools, GST, Lbour welfare cess etc., complete. | 3.40 | Cum |
| 5 | Providing and fixing Tor steel reinforcement for RCC work including work including cost of Tor steel, cutting, bending, binding and placing in position, cost of blinding wire minor tools, GST, labour welfare cess etc. complete | 3.400 | Qtl |