Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4645098 |
|---|---|
| Organisation Name | Himachal Pradesh Irrigation And Public Health Department |
| Tender Brief | Corrigendum : Providing Water Supply Scheme To Lamu In Gp Lamu Tehsil Holi Distt Chamba Sh Construction Of Roughening Filter Intake Chamber And Providing Laying Jointing And Testing Of Gi Pipeline |
| Last Date For Submission | 25th Jun, 2026 |
| Opening Date | 27 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 49267.00 |
| Estimated Cost | 2463368.00 |
| City | Chamba |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundation trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting hard or soft rock by chiseling where the blasting work is prohibited slushy daldal and saturated soil I/c pumping or bailing out water with in all heights, stacking the excavated soil with in 15cm (Fifteen centimeters) when required in to plinths, sides of foundation consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as direction with in all leads of 20meters in Pick, jumper work as directed by the Engineer-in-Charge. | 638.42 | Cum |
| 2 | Providing, Laying, Jointing and testing ofGI. Pipe in treaches galvanized mild steel tube (Meduim grade) tube fittings (Earth work in trenches to be measured and paid for separately) complete including all types of GI fittings within all leads and lifts as per the direction of the Engineer-in-Charge. | ||
| 3 | GI. Pipe 50 mm dia (Medium Grade) | 2225.00 | Rmt |
| 4 | Providing and laying cement concrete work 1 : 3 :6 ( One cement : two sand : four graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth with in all leads & lifts as per the direction of Engineer-in-Charge. | 1.07 | Cum |
| 5 | Providing and laying cement concrete 1:1.5:3(1: cement :1.5 sand :3 graded crushed stone agg. of 20mm. Nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in :- |
4 Days Left