| 1 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetera in all type of classification of soil, comprising of ordinary soil, ordinary rock , hard rock chiseling / wedging out rocks (where blasting is prohibited) as per drawings and MORD technical specification clause 305.1 and as per the directions of the Engineer-in-Charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto any lead and upto any lift including dressing of sides and bottom and back filling in trenches with excavated suitable / approved materials to the original surface in layers not exceeding 150mm one hundred fifty millimeters) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per directions of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate including the octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government. | 308.26 | Per Cubic Metre |
| 2 | Providing and laying mechanically mixed and vibrated plain cement concrete 1:5:10 ( One cement is to five sand is to ten graded crushed stone aggregate 40mm (forty millimeter) nominal size in or under water including pumping or bailing out water( surface and sub soil water), dewatering for all heights /depths and any quantum of water including removal of slush which may arise at the time of laying under water for all heights/ depths, including the cost of form work and curing for 14 ( fourteen) days complete in Retaining walls and Breast walls etcetera as per drawings and MORD technical specification section 802, 900 and 1200 and as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate including the octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government. | 37.36 | Per Cubic Metre |
| 3 | Back filling behind abutments, return walls, wing walls and retaining walls etc. complete as per drawings and MORD technical specification clause 1204.3.8 or as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate including the octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government. | 9.84 | Per Cubic Metre |
| 4 | Providing 100mm (Hundred millimeter) diametre PVC pipe Weep holes in brick masonry/stone masonry, plain/reinforced concrete abutments, wing walls return walls and retaining /breast walls etc., extending through the full width of the structure with slope of 1 (V) : 20 (H) (one vertical is to twenty horizontal ) towards drawing face complete as per drawings and MORD technical specifications clause 614, 709, 1204.3.7 or as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate including the octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government. | 12.00 | Each |
| 5 | Providing and laying Mechanically mixed and vibrated cement concrete for plain cement concrete Grade M-10 (M-ten) nominal mix 1:3:6 (one cement is to three sand is to six graded crushed stone aggregate20 millimetre (Twenty millimetre ) nominal size on ground or under water and curing complete for 14 (fourteen) days , in drain , foundation for all type of structure , etcetra including pumping or bailing out water (surface and sub soil water) dewatering for all depths and any quantum of water including removal of slush which may arise at the time of laying concrete complete for all heights / depths including the cost of form work complete as per drawings and M.O.R.D. technical specification section 800,900 and 1200 or as directed by the Engineer-in-Charge including carriage of material within all leads ,lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government. | 236.62 | Per Cubic Metre |