| 1 | Excavation in foundation for structures in all types of soils and rocks including lead, lift and disposal of surplus material as directed by Engineer-in-charge and MoRD specification clause 305 (R/W, B/W, Parapet, Culvert, Hume Pipe, Causeway, Bridge, Dry Scupper, Catchpit, drain etc.) | 608.700 | Cum |
| 2 | Construction of R. R . stone masonary in cement mortar 1:5 including supply of all materials, labour, t&p & royaltyetc, required for proper completion of work as directed by Engineer-in-charge and MoRD specifications Clause 700 &1604. (R/W, B/W, Parapet, Culvert, Hume Pipe, Causeway, Bridge, Dry Scupper, Catchpit, drain etc. | 82.500 | Cum |
| 3 | Construction of R. R. stone masonary laid dry including supply of all materials, labour, t&p & royalty etc, required for proper completion of work as directed by Engineer-in-charge and MoRD specifications Clause 700 &1604. (R/W, B/W, Dry Scupper, Catchpit etc.) | 106.260 | Cum |
| 4 | HP stone filling in back of structures including supply of all material, labour, T&P etc. required for proper completion as directed by Engineer-in-charge and MORD specification clause 1604.7. (R/W, B/W, Parapet, Culvert, Hume Pipe, Causeway, Bridge, Dry Scupper, Catchpit etc.) | 42.000 | Cum |
| 5 | Providing and laying of concrete for plain/reinforced concrete in open foundations for structures including supply of all materials, labour,t&p&royalty etc,required for proper completion of work as directed by Engineer-in-charge and MORD specifications Clause 800 , 1202 & 1203 for P.C.C grade M 10. (Parapet, Culvert, Hume Pipe, Causeway, Bridge, Dry Scupper, Catchpit etc.) | 16.800 | Cum |