Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Irrigation Department
Tender ID4243615
Organisation NameIrrigation Department
Tender BriefGram Koobi Mein Chandausi Shakha Ke Gata Sankhya 155 Mein Km. 6.455 Se Km. 6.530 Tak Nahar Ka Doula Nirman Evam Side Slope Par Lining Ka Karya.
Last Date For Submission20th May, 2026
Opening Date20 May, 2026
Cost
Document Cost354.00
EMD287000.00
Estimated Cost2865000.00
Location
CityChandausi
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Earthwork in embankment in ordinary soil excavation to be in the form of regular pits and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slopes and also including 1.50 meter lift and 30 metre lead as per directed by Engineer- in -charge159.5CUM
2Earth work in excavation for lip cutting in ordinary soil including all lift and 30 metre lead with back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of all labour, T & P etc but excluding cost of dewatering . The earth from cutting or excavation to be used in making embankment or to be deposited as spoil bank within 30 metre distance as directed by Engineer-in- charge complete required for proper complition of work.127.5CUM
3Providing and laying of Cement Concrete (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work.48.91CUM
4Painting two coats (80/100) of bitumen on top of sleepers after cleaning of surface from dust ,rust etc. including cost of all material, labour and T&P etc. complete required for proper complition of work.93.58SQM
5Providing & Fixing of LDPE Film 200 Micron including cost of all material, labour and T&P etc. complete required for proper complition of work.637.5SQM
20th May, 2026

8 Days Left

WhatsApp