Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4243636 |
|---|---|
| Organisation Name | Irrigation Department |
| Tender Brief | Gram Koobi Mein Chandausi Shakha Ke Km. 6.685 Se Km. 6.760 Tak Nahar Ka Doula Nirman Evam Side Slope Par Lining Ka Karya. |
| Last Date For Submission | 20th May, 2026 |
| Opening Date | 20 May, 2026 |
| Document Cost | 354.00 |
|---|---|
| EMD | 287000.00 |
| Estimated Cost | 2865000.00 |
| City | Chandausi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in embankment in ordinary soil excavation to be in the form of regular pits and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slopes and also including 1.50 meter lift and 30 metre lead as per directed by Engineer- in -charge | 159.50 | CUM |
| 2 | Earth work in excavation for lip cutting in ordinary soil including all lift and 30 metre lead with back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of all labour, T & P etc but excluding cost of dewatering . The earth from cutting or excavation to be used in making embankment or to be deposited as spoil bank within 30 metre distance as directed by Engineer-in- charge complete required for proper complition of work. | 127.50 | CUM |
| 3 | Providing and laying of Cement Concrete (M-15 grade) 1:2:4 including cost of all material, labour and T&P etc. complete required for proper complition of work. | 48.91 | CUM |
| 4 | Painting two coats (80/100) of bitumen on top of sleepers after cleaning of surface from dust ,rust etc. including cost of all material, labour and T&P etc. complete required for proper complition of work. | 93.58 | SQM |
| 5 | Providing & Fixing of LDPE Film 200 Micron including cost of all material, labour and T&P etc. complete required for proper complition of work. | 637.50 | SQM |