Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3886472 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Year 2025-26 Construction Work Of 04 Suite Inspection House Building In Tehsil Chandausi Of Distt Sambhal |
| Last Date For Submission | 8th Apr, 2026 |
| Opening Date | 08 Apr, 2026 |
| Document Cost | 2354.00 |
|---|---|
| EMD | 1075000.00 |
| Estimated Cost | 17500000.00 |
| City | Chandausi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Civil Work Building | ||
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. DSR 2.6.1 | 249.00 | Cum |
| 3 | Construction of subgrade and embankment with approved material obtained from borow pits with all lifts and leads trancporting 3.00 Km upto sites, spreading, grading to required slope and compected to meet requirement of table No. 300-2 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. | 2760.00 | cum |
| 4 | Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete,including cost of form- work,in foundation and floors. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. DSR 4.1.8 | 58.00 | cum |
| 5 | Sand filling in plinth including supply of necessary quantity of sand from a distance not excluding 8km from the site of work and including watering dressing etc. rate to include cost of all materials, labour and T&P etc.required for proper completion of the work. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. DSR 2.27 | 58.00 | Cum |
7 Days Left