Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Chandigarh Administration
Tender ID3821508
Organisation NameChandigarh Administration
Tender BriefCorrigendum : Construction Of Boundary Wall Around Ews Flats Rc Dhanas, Chandigarh
Last Date For Submission2nd Apr, 2026
Opening Date02 Apr, 2026
Cost
Document Cost0.00
EMD94935.00
Estimated Cost4746773.00
Location
CityChandigarh
StateChandigarh

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lifts, as directed by Engineer-in-charge. All kinds of soil (As per DSR 2.6.1)301.79/cum
2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lifts. (As per DSR 2.25)210.32/cum
3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) (As per DSR 4.1.10)8.84/cum
4Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached plasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floors etc. up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) (As per DSR 4.2.3)2.47/cum
5Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. (As per DSR 5.9.1)307.70/sqm
2nd Apr, 2026

Ending Today

WhatsApp