Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3814018 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Ge Chd T 101 2025 26 Construction Of Guard Rest Room At Nahan Under Ge Chandigarh |
| Last Date For Submission | 13th Apr, 2026 |
| Opening Date | 15 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 19200.00 |
| Estimated Cost | 960000.00 |
| City | Chandigarh |
|---|---|
| State | Chandigarh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Surface excavation n.exc. 30 cm deep and averaging 15 cm deep in soft/loose soil and getting out in and including clearing all grass vegetation, saplings, shurbs, brush woods under growth roots and trees not exceeding 30cm girth complete all as specified and directed by Engineer-in-Charge. | 12.00 | SQUARE METRE |
| 2 | Excavation in trenches in soft/loose soil not exceeding 1.50 meter wide and not exceeding 1.5 meter in depth; for foundation or for shafts, wells, cesspits, manholes, pierholes, etc. not exceeding 10 sq. m on plan and getting out complete all as specified. | 13.12 | CUBIC METRE |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth,1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in charge | 34.10 | CUBIC METRE |
| 4 | Returning, filling in, including spreading, leveling, watering and well ramming in layers not exc 25 cm thick each,excavated soil in soft/loose soil, complete, all as specified and directed by Engineer-in-Charge. | 19.35 | CUBIC METRE |
| 5 | Removing of surplus soil/ excavated material to a distance exceeding 250 metre but not exceeding 500 metres and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete, all as specified and directed by Engineer-in-Charge. | 27.19 | CUBIC METRE |
6 Days Left