| Tender ID | 4512178 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Ge I R And D/chd-05/2026-27 Provision Of Rain Water Harvesting Units For Gwt Recharge At Defence Geoinformatics Research Establishment Dgre Plot No 01 And 02 Sector 37-a, Chandigarh |
| Last Date For Submission | 9th Jul, 2026 |
| Opening Date | 11 Jul, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 149130.00 |
| Estimated Cost | 7456000.00 |
| City | Chandigarh |
|---|---|
| State | Chandigarh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m in any kind of soil complete all as specified and directed. | 193.21 | Cum |
| 2 | As item no. 1 above and extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials (1.5 m to 3.00 m) complete all as specified and directed. | 177.42 | Cum |
| 3 | As item no. 1 above and extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials (3.0 m to 4.50 m) complete all as specified and directed. | 123.30 | Cum |
| 4 | Earth work in excavation in any type of soil by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil complete all as specified and directed. | 369.26 | Cum |
| 5 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m for all kinds of soil & Pipes, cables etc. exceeding 80 mm dia. But not exceeding 300 mm dia complete all as specified and directed. | 144.00 | Cum |