Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3830193 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair And Maintenance Of Security Light/street Light, Earthing, Lightening Arrestor And Allied Works At Air Force Station Mullanpur Under Age (i) Highground Chandigarh |
| Last Date For Submission | 22nd Apr, 2026 |
| Opening Date | 29 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 20000.00 |
| Estimated Cost | 1000000.00 |
| City | Chandigarh |
|---|---|
| State | Chandigarh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Material and Labour for installation, commissioning and testing of maintenance free chemical earthing to achive the desired value of resistance should be less than 1.0 ohm comprising of the following components :- (a) Pure Copper earithing rod (Copper Purity 99.9% and Company approved from CPRI) min size 80 mm outer dia x 3 mtr long, Inner Strip top to bottom Size 32 x 6 mm, pre- filled with CCM compound and Copper terminal strip 32x6x100 mm at top with two holes for connection the strip to the load. Make : OBO Earthing, JMB, JMV (Earthing), Powertrack, Ennov, Tirupati (b) Bore hole of the Chemical earth pit > 180mm and depth upto 3.3 mtr (approx) and comprising the Copper earth electrode and chemical earth enhancing Black Fill Compound containing Bentonite powder or graphite filled in earth pit (Approximate qty 50 kg). (c) All connections to the earth strip should be done by exothermic welding. (d) Short Circuit Current Test 25 kA. (e) Supply and fix heavy duty high density lockable plastic cover cum inspection chamber mounted on earthing electrode shall be fixed stainless steel fastners of size including all other required accessories complete the job of earth pit, complete all as specified and directed. (f) Taking down old GI/Copper plate earthing with old Earth pit chamber. Note :- (i) Cost of earth strip and HDPV/GI pipe protection for connecting with Earth Lead shall be measured and paid separately. (ii) The unit rate quoted shall deemed to include the cost of boring of earth in any type of soil, returning, filling in, removal of surpluse soil. | 8.00 | Each Job |
| 2 | Supply and Fix Copper strip 32 x 6.0 mm with saddles and fixing screws on porecelain insulator/ spacer fixed at every 1 mtr length on roof/wall and joining the same with New earth test point including taking down old GI Strip/Wire complete all as specified and directed. Note :- All connections to the earth strip should be done by exothermic welding. | 88.00 | RM |
| 3 | Supply and Fix Copper strip 20 x 3.15 mm with saddles and fixing screws on porecelain insulator/ spacer fixed at every 1 metre length on roof/wall and joining the same with New earth test point including taking down old old GI Strip/Wire complete all as specified and directed. Note :- All connections to the earth strip should be done by exothermic welding. | 140.00 | RM |
| 4 | Supply and Fix air termination single pointed termination copper rod 12mm dia and 300mm long on the GI pipe with suitable insulator, including taking down old Aluminium rod complete all as specified and directed. | 16.00 | Each |
| 5 | Supply and Fix GI pipe of size 50 mm dia light grade in replacement as earthing strip protection laid on trench/floor, fixed on pole/wall complete all as specified and directed. | 48.00 | RM |
5 Days Left