Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3725253 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair To Water Supply Lines And Fittings, Oht And Connected Works At Air Force Station Highground Under Age (i) Highground |
| Last Date For Submission | 4th Apr, 2026 |
| Opening Date | 11 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 20000.00 |
| Estimated Cost | 1000000.00 |
| City | Chandigarh |
|---|---|
| State | Chandigarh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking out defective submersible pump & motor set 7 to 10 stage, 700-900 LPM at 112mtr head of any dia upto 100mm from bore well with the help of chain pulley after disconnecting electrical connections from motor starter, disconnecting the column pipe from supply pipe line, opening each column pipe by unscrewing nut bolt, rubber packing of each column pipe, submersible cable and keeping a-side for reuse the number of column pipe to be . alongwith submersible cable, for repair / replacement of parts to make it fully functional, reassembling the same after repair, lowering/installation to its original position, electric connection of input/ output electric supply, connecting the column pipe to supply pipe line testing to its full load capacity at least for 4 hours and all other relevant tests including any minor repair, replacement of rubber gasket for column pipe etc. transportation to workshop and vice-versa, complete all as specified and directed. | 2.00 | Each Job |
| 2 | Dismantling of submersible motor 38/50 HP 415 volts 50 Hz 3 phase AC electric supply, taking out the burnt winding of stator, removal of burnt insulation material from the slots, cleaning the stator slots and preparation for rewinding the same with and including material and labour for winding the stator of motor with PVC insulated copper winding wire of standard size and superior quality as per the existing gauge and F class insulation materials, turning, balancing & alignment of rotor etc. to get the proper RPM and torque & tested to its full load capacity complete all as specified and as directed. | 1.00 | Each Job |
| 3 | All as per item No 2.00 here-in-before but electric motor of capacity 15/20HP complete all as specified and as directed. | 1.00 | Each Job |
| 4 | Material and Labour for Opening of pump set 7 to 10 stage, 700-900LPM at 112mtr head for repair and replacement of unserviceable parts, reassembling the same after repair, machining work of impeller housing, remetaling of pump shaft, grinding, scraping, cleaning and balancing the same to make it fully functional at the full load capacity including turning, balancing & alignment of shaft etc. reassembling of complete Pump & Motor set and testing on completion for the entire satisfaction of Engineer- in-Charge complete all as specified and as directed Note for item no 1 to 4:- Spare parts required to be replaced shall be measured and paid separately as 'Supply only' from item no 5 to 14. | 2.00 | Each Job |
| 5 | Supply only motor housing rotor bush for 700-900LPM submersible motor complete all as specified and as directed. | 2.00 | Each |
8 Days Left