Tendering Authority: Military Engineer Services
Tender ID3695546
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Repairs/maintenance Incl Periodical Testing Of Fire Fighting Installations, Cleaning Of Fire Tanks, Repair To Fire Pumps And Replacement Of Unsv Fire Hydrants And Accessories At 3 Brd Under Ge (af) Mc Chandigarh
Last Date For Submission10th Apr, 2026
Opening Date13 Apr, 2026
Cost
Document Cost500.00
EMD70000.00
Estimated Cost3500000.00
Location
CityChandigarh
StateChandigarh

Register to see full details

BOQ Items
#ItemQtyUnits
1Attending breakdown complaints in firefighting system comprising of Auto /Manual operational check of the following firefighting /fire hydrant system including related electrical control panel installed for the firefighting system for the location Old MLH/ARS-1 Hanger complete all as specified and as directed :- (a) Centrifugal pump set of cap 90 KW make Kirloskar - 02 Nos (b) Jockey pump set of cap 11 KW make Kirloskar - 01 No, (c) Electical panel - 01 No (d) Fire Hydrant with valve on both side -22 Nos, (e) Sluice valve 250/200/150/100 mm - 27 Nos (f) Pressure switch - 04 Nos, (g) Pressure gauge - 05 (h) Hose cabinet - 31 Nos. Note:- (i) Any minor defect noticed during function l test (i.e.) making electrical connections into the electrical control panel, filling the graphite packing seal into the gland piece of centrifugal type firefighting pump, replacement of rubber flanged gaskets of size 250/150 mm /100 mm with necessary nuts bolts and washers if required to arrest the leakages etc to make the firefighting system functional shall deemed to be included in the quoted item rates. (ii) Periodical serviceability /functional test for locations viz Old MLH/ARS-1 hanger shall be carried out in every month by station fire section . Record of the same shall be maintained and submitted to the Engr-in-Charge duly signed by contractor and his engineer including endorsement from Station fire section. (iii) A recovery of double @ quoted rate shall be made against the contractor for not attending the complaints with in 24 Hrs (iv) Any major unserviceable item related to firefighting system shall be measured and paid for separately under the respective item of schedule if required to be replaced for making the system serviceable.15.00Each Job
2Attending breakdown complaints in firefighting system comprising of Manual operational check of the following firefighting /fire hydrant systemm including related electrical control panel installed for the firefighting system for the location Engine Division/site V and VII complete all as specified and as directed :- (a) Centrifugal pump set of cap 15 HP - 01 Nos (b) Centerifugal pump set 50 HP - 01 No (c) Electical panel - 01 No (d) Fire Hydrant with valve on both side -6 Nos (e) Sluice valve 150/100 mm - 2 Nos (f) Pressure gauge - 01 (g) Hose cabinet - 06 Nos Note: (i) Any minor defect noticed during function l test (i.e.) making electrical connections into the electrical control panel, filling the graphite packing seal into the gland piece of centrifugal type firefighting pump, replacement of rubber flanged gaskets of size 150 mm /100 mm with necessary nuts bolts and washers if required to arrest the leakages etc to make the firefighting system functional shall deemed to be included in the quoted item rates. (ii) Periodical serviceability /functional test for locations viz Engineer Division shall be carried out in every month by station fire section . Record of the same shall be maintained and submitted to the Engr-in-Charge duly signed by contractor and his engineer including endorsement from Station fire section. (iii)A recovery of double @ quoted rate shall be made against the contractor for not attending the complaints with in 24 Hrs (iv) Any major unserviceable item related to firefighting system shall be measured and paid for separately under the respective item of schedule if required to be replaced for making the system serviceable.16.00Each Job
3Attending breakdown complaints in firefighting system comprising of Auto /Manual operational check of the following firefighting /fire hydrant systemm including related electrical control panel installed for the firefighting system for the location Lean Lift building, complete all as specified and as directed :- (a) Centrifugal pump set of cap 100 HP make Kirloskar - 01 Nos (b) Centrifugal pump set 50 HP - 01 Nos, (c) Centrifugal pump set 10 KW - 01 No (d) Diesel Engine driven Pump set 38 KW - 01 No, (e) Electical panel - 02 No (f) Fire Hydrant with valve on both side -22 Nos (g) Sluice valve 250/200/150/100 mm - 27 Nos (h) Pressure switch - 04 Nos, (g) Pressure gauge - 05, (j) Hose cabinet - 31 Nos (k) water sprinkler - 161 Nos Note: (i) Any minor defect noticed during function l test (i.e.) making electrical connections into the electrical control panel, filling the graphite packing seal into the gland piece of centrifugal type firefighting pump, replacement of rubber flanged gaskets of size 250/150 mm /100 mm with necessary nuts bolts and washers if required to arrest the leakages etc to make the firefighting system functional shall deemed to be included in the quoted item rates. (ii) Periodical serviceability /functional test for locations viz Lean lift building shall be carried out in every month by station fire section . Record of the same shall be maintained and submitted to the Engr-in-Charge duly signed by contractor and his engineer including endorsement from Station fire section. (iii)A recovery of double @ quoted rate shall be made against the contractor for not attending the complaints with in 24 Hrs (iv) Any major unserviceable item related to firefighting system shall be measured and paid for separately under the respective item of schedule if required to be replaced for making the system serviceable.14.00Each Job
4Attending breakdown complaints in firefighting system including foam flooding system comprising of Auto /Manual operational check of the following firefighting /fire hydrant systemm including related electrical control panel installed for the firefighting system for the location New MLH Upgrade hanger and IDS Lab complete all as specified and as directed :- (a) Centrifugal pump set of cap 9000 LPM,75 Meter head (make Kirloskar - 02 Nos) (b) Centrifugal pump set 70 Meter head,2850 LPM - 01 Nos, (c) Centrifugal pump set 70 meter head,180 LPM - 01 No (d) Diesel Engine driven Centrifugal pump set of cap 9000 LPM,75 Meter head (make Kirloskar - 02 Nos) (e) Electical panel - 04 No (f) Fire Hydrant with valve on both side -22 Nos (e) Sluice valve 250/200/150/100 mm - 27 Nos (f) Pressure switch - 06 Nos, (g) Pressure gauge - 05, (h) Hose cabinet - 21 Nos (j) RRL hose - 42 Nos (j) Hot foam generator 40 Cum/Min -180 Nos (k) vertical foam bladder tank 2500 ltrs -02 Nos (l) in line proportional TP TP100/50-2 Nos) (m) deluge valve station of 250 mm dia -12 Nos Note: (i) Any minor defect noticed during function l test (i.e.) making electrical connections into the electrical control panel, filling the graphite packing seal into the gland piece of centrifugal type firefighting pump, replacement of rubber flanged gaskets of size 250/150 mm /100 mm with necessary nuts bolts and washers if required to arrest the leakages etc to make the firefighting system functional shall deemed to be included in the quoted item rates. (ii) Periodical serviceability /functional test for locations viz New MLH Upgrade Hanger shall be carried out in every month by station fire section . Record of the same shall be maintained and submitted to the Engr-in-Charge duly signed by contractor and his engineer including endorsement from Station fire section. (iii) A recovery of double @ quoted rate shall be made against the contractor for not attending the complaints with in 24 Hrs (iv) Any major unserviceable item related to firefighting system/foam flooding system shall be measured and paid for separately under the respective item of schedule if required to be replaced for making the system serviceable.18.00Each Job
5Supply and fix in repair brass female coupler for fire hydrand of size 63 mm complete all as specified and directed. (Make :- MEC/NEWAGE/ATASEE/Mitras or any make approved in any command)12.00Each