Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4305024 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repairs To Fencing, Gate, Compound/boundary Wall, Interlocking, Wall Plastering, Sewage Line, Septic Tanks Manholes In Domestic Area Under Ge (af) Mc Chandigarh |
| Last Date For Submission | 6th Jun, 2026 |
| Opening Date | 08 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 90000.00 |
| Estimated Cost | 4500000.00 |
| City | Chandigarh |
|---|---|
| State | Chandigarh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cleaning by using mechanical equipment of solid/liquid mud/any type of solid content including mud, brick bats, empty containers of any type, rags, polythene or any similar items deposited in underground sewage lines depth upto 8 metre including manholes/inspection chamber of any size at any depth (STP and Main lines from pumping station of any dia) entire area at 3 BRD AF Station Chandigarh by using SUPER SUCTION MACHINE TRUCK MOUNTED HAVING SUCTION CAPACITY 1000 TO 4000 CUM/HRS, JETTING PUMP WITH WORKING PRESSURE AT NOT LESS THAN 120 BAR having facilities of high pressure water thermoplastic fiber braided water jetting hose and through conical/round shape nozzlel pipe. Bottom surface of manholes/inspection chambers & sewage lines should be visible after cleaning process. Sludge/sludge water/any type of waste recovered from sewage lines/manholes/inspection chambers shall be disposed off at authorized dumping site declared by local administration outside Ministry of defence land distance exceeding 2Km but n.exc 2.5Km, complete all as specified and directed. | 3000.00 | Running Metre |
| 2 | Note :- (i) All T&P should be arranged by contractor and deemed to included in his quoted rate. (ii) Lines once cleared will be maintained through out the period of the contract. If there is any blockage during the period of the contract, the same will be cleared without any extra cost by the contractor. (iii) In case of any blockage is observed/found in any cleared line through super suction machine during the time period of contract and it becomes necessary to clear the sewage line with machine, the same shall be cleared through machine by the contractor without any extra cost to the department. The line shall be cleared by the contractor within 48hrs after intimation to the contractor. The rate quoted by the contractor against item No 01 above shall be deemed to be inclusive of clearance of line twice or more time as required during the whole contract period. | ||
| 3 | Cleaning and clearing of bore underground sewage line from any type of trap including (WCs/Gully trap/floor traps/CI pipes/Nahani traps/Bathrooms etc) to 1st manholes including trap & manhole of any depth by taking off manhole covers and re-fixing the same after cleaning of any description, underground and any depth by removing any type of blockage including de-silting and de-chocking Sludge/sludge water shall be disposed off at authorized dumping site declared by local administration outside MoD land distance exceeding 2Km but n.exc 2.5Km, complete all as specified and directed. | 500.00 | Each job |
| 4 | Note :- (a) The contractor shall deploy minimum , 01 safaiwala & 01 helper (Total 02 people ) alongwith T&P on regular basis to complaint cell/ service centre of AGE B/R-I under GE (AF) MC Chandigarh located in 3 BRD Domestic area daily between 0830 to 0900hrs (except on Sunday/Gazetted holidays). (b) The complaints shall be attended preferably on the same day and complaints slips duly signed by the user will be deposited back with JE(Civil) on the same day. (c) Working time for all the people employed by the contractor will be from 0900 hrs to 1700 hrs In case of any emergency, they can be called at any time beyond specified time and will be given off at the discretion of Engr-in-Charge. (d) A penalty of Rs 500/- per day per person will be levied in case of absence of any of safaiwala or helper. (e) A pucca bound register shall be maintained for this purpose which shall always be kept in custody of JE Civil indicating date and time of complaint informed and rectified respectively. (f) Manpower/ employees deployed by contractor shall have safety measures for the job and life insurance policy for compensation in case of any accident. The cost for the same is deemed to be include in the unit quoted rate by the bidder. No extra claim will be entertained by the Department. (g) Five (05) complaints will be count as Each job for payment purpose. | ||
| 5 | Sucking out liquid food waste/sewage water through tanker from the Grease trap/septic tank/soakage well in different location of 3 BRD and disposal (5000 ltr capacity) of out of MD land, complete all as specified and directed. | 60.00 | Each Tanker of 5000 Litre |
6 Days Left