Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4274750 |
|---|---|
| Organisation Name | Airports Authority Of India |
| Tender Brief | Grading Of Operational/ Non-operational Area And Miscellaneous Civil Works At Chandigarh International Airport Limited. |
| Last Date For Submission | 3rd Jun, 2026 |
| Opening Date | 04 Jun, 2026 |
| Document Cost | 1180.00 |
|---|---|
| EMD | 1471380.00 |
| Estimated Cost | 49046000.00 |
| City | Chandigarh |
|---|---|
| State | Chandigarh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift up to 1.5 m. All kinds of soil. a) Inside Operational area | 355290.00 | Sqm |
| 2 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift up to 1.5 m. All kinds of soil. b) City side area | 202370.00 | Sqm |
| 3 | Excavation for earth work in all kinds of soil with hydraulic excavator of 0.90 cum bucket capacity including cutting & loading in tippers, trimming bottom and side slopes in accordance with requirement of line, grades, and cross section and transporting to the required locations, with all lifts and lead within Airport premises as directed by Engineer-in-Charge. a) Inside Operational area | 53295.00 | Cum |
| 4 | Excavation for earth work in all kinds of soil with hydraulic excavator of 0.90 cum bucket capacity including cutting & loading in tippers, trimming bottom and side slopes in accordance with requirement of line, grades, and cross section and transporting to the required locations, with all lifts and lead within Airport premises as directed by Engineer-in-Charge. b) City side area | 30360.00 | Cum |
| 5 | Construction of embankment with available excavated earth received from agreement item No.1 and 2 above. The complete operation will include filling the same in embankment, depressions, low lying area, shoulders etc, in layers not exceeding 20 cm (loose) in depth of each layer i/c breaking clods, consolidating each layer with roller, or wooden or steel rammers, and rolling top-most layer with power roller of minimum 8 tonnes weight including levelling, fine dressing to required grade, camber and slope etc complete, item will include spreading the earth with dozer, dressing, levelling , providing camber, grading with motor grader to meet the requirements as per MORTH/CPWD specification with all lifts and lead within Airport premises as directed by Engineer-in-Charge. a) Inside Operational area | 53295.00 | Cum |
Closed