Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4441255 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Providing And Fixing Pcc Tiles Footpath In Block From Plot No. 209 To 216 In Industrial Area, Phase-1, Chandigarh (mdf) |
| Last Date For Submission | 5th Jun, 2026 |
| Opening Date | 05 Jun, 2026 |
| Document Cost | 3000.00 |
|---|---|
| EMD | 54152.00 |
| Estimated Cost | 2707532.00 |
| City | Chandigarh |
|---|---|
| State | Chandigarh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. (DSR 16.82) | 484.00 | Rmt |
| 2 | Taking out existing Channel of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. (N.S) | 484.00 | Rmt |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer in charge 1:3:6 or richer mix (DSR 15.2.1) | 93.00 | Cum |
| 4 | Earthwork in excavation by mechanical means (Hydraulic excavator)/ manual means over areas ( exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m, and excluding disposed earth to be levelled and neatly dressed. All kinds of soil complete in all respect to the entire satisfaction of the Engineer-In-Charge. (DSR 2.6.1) | 414.00 | Cum |
| 5 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. (DSR 15.60) | 414.00 | Cum |
5 Days Left