Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4852198 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Raising Kerb And Channel And Road Marking Work (part-b) Under The Work Of Re-carpeting Of Various Roads Falling Under Road Sub Division No. 7, M.c., Chandigarh |
| Last Date For Submission | 20th Jul, 2026 |
| Opening Date | 20 Jul, 2026 |
| Document Cost | 3000.00 |
|---|---|
| EMD | 279725.00 |
| Estimated Cost | 13986269.00 |
| City | Chandigarh |
|---|---|
| State | Chandigarh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. (Ref 16.82) | 16904.00 | Rmt |
| 2 | Taking out existing Channel of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 37515.00 | Rmt |
| 3 | Providing and Laying of kerb of size 1 -0 x 1 -0 having 4 thickness at or near ground level in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. (N.S.) | 4670.00 | Rmt |
| 4 | Providing and fixing PCC kerbs of size 1'-0" x1'-0" x 6'' thickness at bottom and 5 thickness at top duly vibrated, mechanically & compacted made of plain cement concrete 1:2:4 duly cured and finished. The rate further includes filling of joints between kerbs with cement mortar 1:4 (1 Cement: 4 coarse sand) after earth work in excavation/filling and removing the same from site of work complete in all respects and to the entire satisfaction of the Engineer-in-charge.. (N.S.) | 4342.00 | Rmt |
| 5 | Providing and Laying of kerb of size 2 -0 x 9 having 4 thickness at bottom and 3 thickness at top and made of plain cement concrete 1:2:4 duly vibrated and compacted. The rates also includes fixing in position at or near ground level in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. (N.S.) | 2587.00 | Rmt |