Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4852193 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Re - Construction Of Paver Block/pcc Tile Pavement After Dismantling Of Existing Paver Block/pcc Tile On V - 5 Road Sector 45/a, Chandigarh. |
| Last Date For Submission | 20th Jul, 2026 |
| Opening Date | 20 Jul, 2026 |
| Document Cost | 3000.00 |
|---|---|
| EMD | 42547.00 |
| Estimated Cost | 2127000.00 |
| City | Chandigarh |
|---|---|
| State | Chandigarh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of Cement concrete paver blocks/pcc tile and stacking the serviceable Paver blocks at site and disposal of the unserviceable paver blocks within average lead of 2 Km complete in all respect to the entire satisfaction of the Engineer-In-Charge. (N.S) | 1992.80 | Sqm |
| 2 | Dismantling of Kerb and stacking the serviceable kerb properly at site and disposal of the unserviceable kerb average lead of 2 Km complete in all respect to the entire satisfaction of Engineer - In - Charge.(N.S.) | 925.10 | Rmt |
| 3 | Dismantling of channels and stacking the serviceable channel properly at site and disposal of the unserviceable channel average lead of 2 Km complete in all respect to the entire satisfaction of Engineer - In - Charge.(N.S.) | 917.80 | Rmt |
| 4 | Preparation of sub grade including trenching rough dressing of soil, final dressing of earth to give level and camber,watering, rolling with a road roller and compaction of bed complete in all respect to the entire satisfaction of Engineer - In Charge.(N.S.) | 1992.7980 | Sqm |
| 5 | Providing and laying granular sub base, spreading and compacting course graded sub base material sand , morrow, graval, crushed stone of combination thereof confirming to grading II of table 400.2 of MORTH specification (latest revision as on date). The material shall be mixed by mix in place method or with motivator at OMC and carried to site, spread in uniform layers and compacted with 8-10 tones smooth heeled/Vibratory roller to achieve desired density. Complete in all respect as per clause 401 of MORT&H specification (latest revision as on date) as per direction of Engineer - in - Charge. | 149.46 | Cum |
13 Days Left