| Tender ID | 5023639 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Repair Of Existing Pavement By Laying Cement Concrete Along Boundary Wall Of Punjab University And Re-fixing Of Old Tile At Janta And Kumhar Colony Sector 25 Chandigarh |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 27 Jul, 2026 |
| Document Cost | 3000.00 |
|---|---|
| EMD | 60162.00 |
| Estimated Cost | 3008118.00 |
| City | Chandigarh |
|---|---|
| State | Chandigarh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking out existing CC PCC Tiles from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge DSR 16.83 | 3401.490 | Sqm |
| 2 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.DSR 16.82 | 277.440 | Rmt |
| 3 | Taking out existing channel of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 152.440 | Rmt |
| 4 | Laying old PCC Kerb in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. Length of finished kerb edging shall be measured for payment. | 125.000 | Rmt |
| 5 | Laying old Channel in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. Length of finished Channel edging shall be measured for payment. | 60.980 | Rmt |