Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4852191 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Restoration Work Against Ph Work Of P/l Of 600mm I/d And 450mm I/d Rcc Np 2 Pipe Line Along With Construction Of New Machine Holes And Road Gullies Near Plot No 29 Mw Ind Area Phase-i Chd For Smooth Functioning Of Storm Water Drainage System |
| Last Date For Submission | 13th Jul, 2026 |
| Opening Date | 13 Jul, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 22920.00 |
| Estimated Cost | 1146000.00 |
| City | Chandigarh |
|---|---|
| State | Chandigarh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil. DSR 2.6.1 | 301.91 | Cum |
| 2 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. DSR 15.60 | 301.91 | Cum |
| 3 | Preparation of sub grade including trenching rough dressing of soil, final dressing of earth to give leval and camber, watering, rolling with a road roller and compaction of bed complete in all respect to the entire satisfaction of Engineer in charge | 990.75 | Sqm |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete (DSR 2.27 | 150.9600 | Cum |
| 5 | Construction of granular sub-base by providing Material conforming to Grading-II --- Table 400-1 including mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller 8 to 10 tonne to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge & as per clause 401 of MORTH specifications (5th revision) | 150.96 | Cum |
6 Days Left