Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Municipal Corporation
Tender ID4852197
Organisation NameMunicipal Corporation
Tender BriefSpecial Repair Of Footpath Paver Block On V-4 And V-5 Roads, Including Painting Of Kerbs, At Sector 27, 28 And 29, Chandigarh
Last Date For Submission20th Jul, 2026
Opening Date20 Jul, 2026
Cost
Document Cost3000.00
EMD82125.00
Estimated Cost4106267.00
Location
CityChandigarh
StateChandigarh

Register to see full details

BOQ Items
#ItemQtyUnits
1Taking out existing PCC tiles from footpath including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.1244.41Sqm
2Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.2259.94Sqm
3Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.709.15Rmt
4Taking out existing Channel of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.709.15Rmt
5Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 5 km for all lifts, complete as per directions of Engineer-in-charge.(DSR 1.1.18)201.40Cum
20th Jul, 2026

13 Days Left

WhatsApp