Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3882457 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Ca No Ge(u)/chm-81/2025-26 Provn Of Rain Water Harvesting Facility Of Otm Accn, Covered Shed For Food Trolley At Patients Cook House And Open Parking Facility Opposite Jcos/or Basera Guest Rooms At Ch (wc) And Cmdc (wc) Under Ge (u) Chandimandir |
| Last Date For Submission | 27th Apr, 2026 |
| Opening Date | 02 May, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 66700.00 |
| Estimated Cost | 3332000.00 |
| City | Chandimandir |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in any type of soil (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in charge | 35.00 | Cum |
| 2 | Excavating in trenches, not exceeding 1.5m wide and not exceeding 1.5m in depth, for foundations etc or manholes, cesspits, pipes and cables etc. not exc 10 Sqm on plan and getting out in any type of soil all as specified and directed by Engineer - in - Charge. | 120.00 | Cum |
| 3 | Earth work in excavation by mechanical means in any type of soil (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift exceeding 1.5m but not exceeding 3.0m, as directed by Engineer-in charge | 35.00 | Cum |
| 4 | Earth work in excavation by mechanical means in any type of soil (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift exceeding 3.0m but not exceeding 4.5m, as directed by Engineer-in charge | 27.00 | Cum |
| 5 | Excavating in post holes (or similar holes) each not exceeding 0.5 cum, getting out, returning, filling in and ramming earth, in layers not exceeding 25cm, watering, and removing surplus spoil to a distance not exceeding 50m and making good surface all as specified and directed by Engineer - in - Charge. | 12.00 | Each |
13 Days Left