Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4645899 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Ca No Ge(u)/chm-07/2026-27 Provn Of Stainless Steel Railing At Various Floors At Building No Ch 61 Of Ch (wc) Chandimandir |
| Last Date For Submission | 14th Jul, 2026 |
| Opening Date | 18 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 86750.00 |
| Estimated Cost | 4337000.00 |
| City | Chandimandir |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Material & Labour for providing and fixing stainless steel (Grade 304) railing made of hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (where ever required) and fitting the same with necessary stainless steel nuts and bolts complete, including fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of floor or the side of waist slab with suitable arrangement | 8558.00 | Kg |
| 2 | Taking down cement plaster/ terrazo finish on brick wall including racking out joints, hacking for keys scrubbing down with water all as specified and directed by Engineer - in - Charge. | 150.00 | Sqm |
| 3 | M & L rendering 10mm thick on fair faces of brick work or concrete surfaces in CM 1:6 finished even & smooth without using extra cement and making good disturbed surface all as specified and directed by Engineer - in - Charge . | 150.00 | Sqm |
| 4 | M & L two coats of distemper oil emulsion over a coat of primer and wall putty (Asian / JK / Birla), preparatory to distempering, on newly plastered surfaces of walls including preparation of surfaces all as specified and directed by Engineer - in - Charge. | 150.00 | Sqm |
| 5 | Demolition of cement concrete (un-reinforced) in floors / pavings, (below or above ground level) and of any description and in any position not otherwise specifically provided for all as specified and directed by Engineer - in - Charge . | 2.00 | Cum |
6 Days Left