Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4342229 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Ge/chm-24/2026-2027 Repair And Maint Of Bldgs Of Minor Units Including Stn Hq, Dcsc, Wksp Under Age B/r I At Chandimandir |
| Last Date For Submission | 10th Jun, 2026 |
| Opening Date | 12 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 80000.00 |
| Estimated Cost | 4000000.00 |
| City | Chandimandir |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolition of un-reinforced cement concrete any description and in any position including sunken portion, not other wise specially provided for ,complete all as specified and directed. | 10 | Cubic Metre |
| 2 | Demolition of brick tiles or terracing tiles, pointed in cement mortar alongwith cement screed or plaster and removing rubbish etc outide the MOD land complete all as specified and as directed by Engineer-in-Charge. | 350 | Square metre |
| 3 | Demolition of Mud in roofs, any thickness, including plastering and leeping (whether full thickness removed or only a part thereof) complete all as specified and as directed by Engr-in-Charge. | 20 | Cubic Metre |
| 4 | M&L for 50 mm thick (average thickness) PCC 1:2:4, type B-0 (using 12.5 mm graded stone aggregates) as in levelling course, sub base and roof padding, including mixed with WPC complete all as specified and as directed by Engineer-in-Charge. Note : WPC shall be measured and paid for separately. | 350 | Square metre |
| 5 | M&L for 10 mm thick rendering in CM 1:4 plaster mixed with water proofing compound on roof surfaces including junction of parapets etc., and adjoining vertical surfaces and applying bituminous primer @ 0.40 litres per square meter including APP based polymeric membrane minimum weighing 3 kg/ Sqm and minimum 3 mm thick reinforced with polyester non woven fabric (weight not less than 150 gms/ sqm) laid on primed surface by torch application including cleaning & preparation of surface complete all as specified and as directed by Engineer in-Charge. Note : WPC shall be measured and paid for separately. | 350 | Square metre |
8 Days Left