Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3938732 |
|---|---|
| Organisation Name | Western Coalfields Limited |
| Tender Brief | Corrigendum : Repair Of Railway In-motion Weighbridge Platform Near Railway Siding Of Hlsa Under Chandrapur Area. |
| Last Date For Submission | 22nd Apr, 2026 |
| Opening Date | 24 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 6600.00 |
| Estimated Cost | 520687.00 |
| City | Chandrapur |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Item Description/ Heading | ||
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 5.77 | Cum |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 8.68 | Cum |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1.41 | Cum |
| 5 | Providing and laying in position ready mixed or site batched design mix reinforcement cement concrete using coarse aggregate and fine aggregate derived from natural sources, rapid hardening cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centring, shuttering and finishing as per direction of the engineer-in charge; for the following grade of concrete. all work upto plnth lavel, concrete of M25 grade with minimum cement content of 300kg/cum. (Note: extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately in case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement ). | 16.80 | Cum |
3 Days Left