Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Western Coalfields Limited
Tender ID4492920
Organisation NameWestern Coalfields Limited
Tender BriefCorrigendum : Shifting Of One Nos. Dumper Shed From Poc To Boc Along With Provision Of Rooms At Two Locations Under Bsa Of Chandrapur Area (retender).
Last Date For Submission23rd Jun, 2026
Opening Date24 Jun, 2026
Cost
Document Cost0.00
EMD291000.00
Estimated Cost23278180.00
Location
CityChandrapur
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.898.57cum
2Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.251.95cum
3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) 146.05cum
4Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) 229.44cum
5Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) 6.54cum
23rd Jun, 2026

3 Days Left

WhatsApp