| Tender ID | 4382737 |
|---|---|
| Organisation Name | Chennai Metro Rail Limited |
| Tender Brief | Civil Maintenance And Other Associated Works In Section Ii (high Court Metro Station To Wimco Nagar Depot Station) Of Corridor I Of Phase I And Phase I Extension |
| Last Date For Submission | 24th Jun, 2026 |
| Opening Date | 24 Jun, 2026 |
| Document Cost | 24000.00 |
|---|---|
| EMD | 769000.00 |
| Estimated Cost | 76900000.00 |
| City | Chennai |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | NOTE: 1.Evaluation will be done by excluding Provisional sum and GST Amount 2.GST is to be quoted @ rate of 18% 3.The bid price shall be net of Input Tax credit availed by the bidder i.e., base price shall not have any GST component in it. In effect, the clause 171 of GST, that is, the Anti-Profiteering Rule shall be adhered to. A self-declaration from the bidder on clause 171, shall be attached with the invoice. The output GST paid by the bidder shall be reimbursed by CHENNAI METRO RAIL LIMITED on production of the documentry evidence Preamble to Bill of Quantities: 1) Bill of Quantities should be read in conjunction with the conditions given in the General Conditions of Contract and Special Conditions of Contract, and the rates should be quoted accordingly. 2) Quoted rate should be inclusive of all incidental and enabling charges such as scaffolding, man lift, ladder, roping System, lighting arrangements, etc., to carry out the works. No additional charge will be paid other than for the measurement. 3). Rates should be quoted considering the restricted working hours since the contractor shall be allowed to carry out the works only during the non-revenue hours if required. Works should be planned as per the block schedule finalised by the CMRL from time to time. 4). Quantities given in the Bill of quantities are indicative only. All items shall be paid only against the actual quantities executed at the site. 5). The Value of Variation is limited to +/- 25 %. 6). The quoted rates should be inclusive of all design & drawing, supply, fabrication and installation at the site. Nothing shall be claimed extra in this regard. | ||
| 2 | SUMMARY OF PRICE BID | 1.00 | Nos |