Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4449450 |
|---|---|
| Organisation Name | Corporation Of Chennai |
| Tender Brief | Construction Of Collection Well Near Ganespuram Subway (north Side) In Divison 71 Zone 6 |
| Last Date For Submission | 9th Jun, 2026 |
| Opening Date | 10 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 95500.00 |
| Estimated Cost | 9510526.00 |
| City | Chennai |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supplying and erecting in position LIGHT DUTY STEEL TRUSSES as per the drawing. The materials and design of the trusses should confirm to the relevant Indian Standard specification. The trusses shall be procured only from reputed manufactures of trusses with prior approval of the Buildings Engineer and a certificate to the effect from the reputed manufacturers shall also be furnished with design. The rate quoted shall include the cost of trusses. Base-plate with holding down bolts and nuts to RCC or Masonry works, roof purlins, rafters, purlin sleeves, the members fixing accessories etc., painting one coat of red-oxide paint and erecting in position etc., complete as directed during execution. The contractor shall also arrange to providegrouting for holding down bolts embeding the end purlins, to the gable wall wherever necessary etc., The roof sheeting shall project 0.762m from the eves purlins. For structures like CYCLE STAND, PARKING GARAGE, TEMPORARY ENCLOSERS | 1920.00 | kg |
| 2 | Sinking well below water level including all incidental charges using special tools and plants such as air compressor, helmet etc., complete and including baling out water. First depth of 2 metres | 2.00 | One Metre |
| 3 | Sinking well below water level including all incidental charges using special tools and plants such as air compressor, helmet etc., complete and including baling out water. Second depth of 2 metres | 2.00 | One Metre |
| 4 | Sinking well below water level including all incidental charges using special tools and plants such as air compressor, helmet etc., complete and including baling out water. Third depth of 2 metres | 2.00 | One Metre |
| 5 | Sinking well below water level including all incidental charges using special tools and plants such as air compressor, helmet etc., complete and including baling out water. Fourth depth of 2 metres | 2.00 | One Metre |
9 Days Left