Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Corporation Of Chennai
Tender ID4449453
Organisation NameCorporation Of Chennai
Tender BriefConstruction Of Collection Well Near Ganespuram Subway (south Side) In Divison 71 Zone 6
Last Date For Submission9th Jun, 2026
Opening Date10 Jun, 2026
Cost
Document Cost0.00
EMD93500.00
Estimated Cost9308470.00
Location
CityChennai
StateTamil Nadu

Register to see full details

BOQ Items
#ItemQtyUnits
1Supplying and erecting in position LIGHT DUTY STEEL TRUSSES as per the drawing. The materials and design of the trusses should confirm to the relevant Indian Standard specification. The trusses shall be procured only from reputed manufactures of trusses with prior approval of the Buildings Engineer and a certificate to the effect from the reputed manufacturers shall also be furnished with design. The rate quoted shall include the cost of trusses. Base-plate with holding down bolts and nuts to RCC or Masonry works, roof purlins, rafters, purlin sleeves, the members fixing accessories etc., painting one coat of red-oxide paint and erecting in position etc., complete as directed during execution. The contractor shall also arrange to providegrouting for holding down bolts embeding the end purlins, to the gable wall wherever necessary etc., The roof sheeting shall project 0.762m from the eves purlins. For structures like CYCLE STAND, PARKING GARAGE, TEMPORARY ENCLOSERS1920.00kg
2Sinking well below water level including all incidental charges using special tools and plants such as air compressor, helmet etc., complete and including baling out water. First depth of 2 metres2.00ONE METRE
3Sinking well below water level including all incidental charges using special tools and plants such as air compressor, helmet etc., complete and including baling out water. Second depth of 2 metres2.00ONE METRE
4Sinking well below water level including all incidental charges using special tools and plants such as air compressor, helmet etc., complete and including baling out water. Third depth of 2 metres2.00ONE METRE
5Sinking well below water level including all incidental charges using special tools and plants such as air compressor, helmet etc., complete and including baling out water. Fourth depth of 2 metres2.00ONE METRE
9th Jun, 2026

9 Days Left

WhatsApp