Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4209837 |
|---|---|
| Organisation Name | Food Corporation Of India |
| Tender Brief | Corrigendum : Renovation Of Exterior Elevation And Officers Cabins And Works Spaces And Other Miscellaneous Works For Fci Zonal Office Building G Plus 4, Chennai Civil And Em Works |
| Last Date For Submission | 15th Jun, 2026 |
| Opening Date | 16 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 2341800.00 |
| Estimated Cost | 117087735.00 |
| City | Chennai |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/ structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works. | 3242.40 | sqm |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge: In cement mortar | 239.03 | cum |
| 3 | Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-charge. | 3815.92 | sqm |
| 4 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 129.66 | cum |
| 5 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or richer mix (i/c equivalent design mix) | 47.33 | cum |
10 Days Left