Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Integral Coach Factory
Tender ID5369015
Organisation NameIntegral Coach Factory
Tender BriefCorrigendum : Shell Kit For Rapid Metro D Shells To Drawing Number (715,716) A) Sidewall Assembly 57514001 Alt 'f' Col I - 1 No And 57514001 Alt 'f' Col Ii- 1 No Roof Assembly- 77616001 Alt 'b' Col I - 1 N0 Schedule Of Technical Requirement To Specn Icf/md/specn.200, Issue Status-01, Rev-04 With Amendment-01. B) End Wall To Drg No. (619)emu/d/hc/3ph-1-5-001, Col-i, Alt 'g'- 1 No The Firm Shall Fulfil The Requirement As Per Icf/md/spec-315,issue Status-01, Rev.00, Amendment No.01. C) Under Frame 57511001, Col2 Alt 'n'- 1 No The Manufacturing Facility As Per Icf/md/spec-147, Issue Status-01 Rev.02 With Amendment No.02. D) Body Shell Items-(715)emu/d/mmts-1-0-002 Alt 'b' Col-i - 1 No. Supply Condition: Back Piece For Seats And Partitionframe To Drg No (715) Emu/d/mmts-1-0-002 Alt 'b' Col-i - 1 No, To Be Welded On Underframe And Supplied. Special Condition : A) Packing As Per Icf/j&t/misc-2201, Alt 'f' B) Packing As Per Icf/j&t/sk-1809, Alt 'a'. C) Packing Condition As Per Drg.no.icf/j&t/misc-2487, Alt 'b' The Underframe Should Be Supplied As Normal Side Up & Side Bearer Side Down. D) Packing Condition As Per Icf/j&t/sk-1865, Alt "a". Stage Inspection Details (a) Raw Material Stage # Ensure The Raw Material Used Using Portable Spectrometer (b) Jig Stage # Assembly Of Front Part With Sole Bar. # Assembly Of Modular Frame Arrangement. # Weld Parameters To Be Checked & Recorded (c) Trestle Stage # Marking, Drilling & Tapping Of Holes Wherever Necessary. # Marking & Placing Of Detail Items. # Complete Welding Wherever Necessary. # Weld Parameters To Be Checked & Recorded # Assembly & Weldingof Trough Sheets. # Dimensional & Visual Checks. # Punching Of Serial No & Ensuring Proper Traceability. (d) Surface Preparation And Painting Stage. # Short/sand Blast To The Requirements. # Painting Process As Per The Specification. # Visual Inspection. # Final Product Inspection. Note: Application Of Aluminium Welding Coat To Rcf Spec Mdts-28272 Latest Revision On Top Surface Of Cross Members Shall Be Ensured Before Welding The Trough Floor With Cross Members To Avoid Bi-metallic Corrossion. [safety Item ]
Last Date For Submission29th Sep, 2026
Opening DateRefer to Documents
Cost
Document Cost0.00
EMD0.00
Estimated Cost0.00
Location
CityChennai
StateTamil Nadu

Register to see full details

29th Sep, 2026

9 Days Left

WhatsApp