Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5415238 |
|---|---|
| Organisation Name | Integral Coach Factory |
| Tender Brief | Corrigendum : Supply And Installation Of Ep Brake Equipment For End Basic Unit For Emu Rakes To Rdsospecification Rdso/2013/cg-03 ( Latest Revision / Amendment) As Follows: 1.for Emu D Coach To Material Schedule No.icf/sk-10-2-575,issue Status-01, Rev.03.cs-01,cs-02,cs-03 & Cs-04, Qty-1 Set 2.for Emu B Coach To Material Schedule No Icf/sk-10-2-574,issue Status-01, Rev-03, Cs-01,cs-02 & Cs-03, Qty-1 Set 3.for Emu C Coach To Material Schedule No.icf/sk-10-2-573,issue Status:01, Rev.03,cs-01,cs-02 & Cs-03, Qty -1 S Installation : Installation To Be Done As Per Scope Of Installation & Testing Icf/mfpl/170/001, Issue Status-01,rev-02,amd-01,schedule Of Drawing And Permissible Timings For (a) Emu D Coach: Icf/mfpl/170/575, Issuestatus-01, Rev-00. (b) Emu B Coach: Icf/mfpl/170/574, Issue Status-01, Rev-00. (c) Emu C Coach: Icf/mfpl/170/573, Issue Status-01, Rev-00. Note: 1. Packing Condition Shall Be As Per Doc.no.pc-052 Of Icf/md/spec-485. 2. Quantity Required Per Rake: 2 Sets [ Warranty Period: 36 Months After The Date Of Delivery ] |
| Last Date For Submission | 16th Sep, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 0.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 0.00 |
| City | Chennai |
|---|---|
| State | Tamil Nadu |
5 Days Left